Mountain Trail Solar is a proposed utility-scale solar energy project in Windsor Township, Berks County, developed by Leeward Renewable Energy. Planned as a 50-megawatt facility on roughly 500 acres of privately owned land, it would supply renewable power to the regional grid for 30 or more years.

Mountain Trail Solar Logo

Mountain Trail Solar at a glance

Leeward Renewable Energy is working on the development of Mountain Trail Solar Energy, a 50-megawatt (MW) solar facility on approximately 500 acres of privately-owned land in Windsor Township, PA. Mountain Trail Solar will help meet demand for renewable energy in Pennsylvania and is expected to operate for 30+ years. The project will also provide economic investment to the community, including an increased property tax base for Windsor Township, tax dollars to help fund local schools, and add a significant number of jobs during construction. Mountain Trail Solar is also committed to being a dedicated member of the community and will continue to build lasting partnerships with civic leaders, property owners, and community members.

About Mountain Trail Solar

Mountain Trail Solar is a proposed utility-scale solar energy facility in Berks County, Pennsylvania, under development by Leeward Renewable Energy. As described in the company's own listing, the project is planned as a 50-megawatt solar generating facility sited on roughly 500 acres of privately owned land in Windsor Township. Once operational, the facility is expected to produce electricity for 30 or more years, feeding renewable power into the regional grid that serves Pennsylvania and the broader mid-Atlantic region.

Unlike a retail business or service provider, Mountain Trail Solar is an infrastructure project. Its "customers" in the conventional sense are electricity purchasers and the regional transmission system, while its most direct local relationships are with participating landowners, township officials, school districts, and neighboring residents. Information below reflects what the developer has stated publicly about the project and the general context of solar development in southeastern Pennsylvania.

Project Scope and Scale

A 50-megawatt alternating current solar facility sits in the mid-size range for utility-scale solar in the eastern United States. Projects of this capacity typically consist of tens of thousands of photovoltaic panels mounted on racking systems, often single-axis trackers that pivot through the day to follow the sun, along with inverters, transformers, access roads, perimeter fencing, and a substation or interconnection point that ties the facility into existing transmission or distribution lines.

The 500-acre figure describes the overall project area rather than the footprint occupied by equipment. In practice, solar developments of this type leave substantial portions of the land open for vegetative cover, setbacks, screening buffers, drainage features, and stormwater management. Spacing between panel rows is required for maintenance access and to prevent shading, which means the land within a solar array is not fully built over in the way a warehouse or housing development would be.

Solar facilities of this size generate no emissions during operation, consume no water for fuel or cooling, and produce very little noise beyond the hum of inverters and transformers. Panels are mounted at heights that generally keep the array below the roofline of nearby structures, and developers commonly install landscaped screening along public road frontages and adjacent residences.

Location and Setting

Windsor Township is located in northern Berks County, in a part of Pennsylvania characterized by agricultural land, wooded ridgelines, and small boroughs. Berks County has historically been a center of farming and manufacturing, and in recent years has seen interest from renewable energy developers due to a combination of available acreage, favorable terrain, and proximity to transmission infrastructure and load centers in eastern Pennsylvania.

Pennsylvania sits within the PJM Interconnection, the regional transmission organization that coordinates wholesale electricity across thirteen states and the District of Columbia. Projects seeking to connect to the grid in this territory move through PJM's interconnection queue, a multi-stage study process that evaluates how a proposed generator would affect system reliability and what network upgrades may be needed. This process, along with local land use approvals and environmental permitting, shapes the timeline for projects like Mountain Trail Solar.

Developer Background

Leeward Renewable Energy is a renewable energy company that develops, owns, and operates wind, solar, and energy storage projects across the United States. The company maintains a portfolio of operating wind and solar facilities along with a development pipeline spanning multiple states and technologies. Leeward is owned by OMERS Infrastructure, an arm of the Ontario Municipal Employees Retirement System, which places the company among the renewable developers backed by long-term institutional capital rather than short-term project flippers.

That ownership structure is relevant to how a project like Mountain Trail Solar is presented to a host community. Developers that intend to own and operate assets over decades generally emphasize durable local relationships, long-term lease arrangements with landowners, and decommissioning commitments, since they expect to remain present in the community well past the construction phase.

Stated Community and Economic Benefits

According to the project's own description, Mountain Trail Solar is expected to deliver several categories of local economic benefit:

  • An increased property tax base for Windsor Township, reflecting the assessed value of the installed generating equipment and improvements
  • Tax revenue that contributes to funding for local schools serving the area
  • A significant number of jobs during the construction period, which for a project of this scale typically involves crews handling site preparation, racking and panel installation, electrical work, and civil construction
  • Lease payments to participating private landowners, providing a stable income stream from acreage enrolled in the project

Construction employment on utility-scale solar projects is temporary but concentrated, often spanning several months to a year and drawing on regional trades, equipment operators, and electrical contractors. Long-term operational staffing is smaller, generally involving a modest number of technicians handling monitoring, panel washing, vegetation management, and preventive maintenance, frequently supported by regional service teams.

Community Engagement

The developer has stated an intention to function as a dedicated member of the community and to build lasting partnerships with civic leaders, property owners, and residents. In practice, this kind of engagement for solar projects in Pennsylvania commonly includes participation in township supervisor and planning commission meetings, open houses or informational sessions for neighbors, direct outreach to adjacent property owners, and ongoing coordination with emergency services on site access and safety planning.

Residents and officials with questions about a project at this stage typically seek information on visual screening plans, construction traffic routing, stormwater and erosion controls, agricultural soil protection, glare studies, vegetation and pollinator habitat plans, and decommissioning guarantees that address removal of equipment and restoration of the land at the end of the facility's operating life. These subjects are generally addressed through the local land development review process and any conditional use or zoning approvals that apply in the township.

Practical Information

Mountain Trail Solar does not operate as a walk-in business and does not list a public phone number in this directory entry. Inquiries about the project, including questions from landowners, local officials, contractors interested in construction work, or residents seeking details on project status, are generally directed to Leeward Renewable Energy's corporate development and community relations channels. Township-level filings, hearing notices, and plan submissions related to the project would be available through Windsor Township municipal offices and Berks County records as the development process advances.

Because utility-scale solar projects move through multi-year development cycles involving interconnection studies, permitting, financing, and equipment procurement, details such as construction start dates, final acreage, and commercial operation timing are subject to change as the project progresses.

Contact Mountain Trail Solar